Timeline
From The Shamanic Labyrinth Project
March 11-13, 18-20, 25-27: Build weekends Dig pathways; lay out the crystal grid; set the four corners; position poles for structure support in both the labyrinth and the after-care area; cement pathways, structural supports, center platform, and other permanent features; install tunnel skeleton. Saturday night of each weekend, we will be conducting a ritual on the labyrinth site, after dark, but before dinner.