Timeline

From The Shamanic Labyrinth Project
Revision as of 22:11, 13 December 2015 by Shamaniclabyrint (Talk | contribs) (Created page with "January 9-11 or 13: [http://www.shamaniclabyrinth.com/janbuild.html Build weekend] Dig pathways; lay out the crystal grid; set the four corners; position poles for str...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

January 9-11 or 13: Build weekend Dig pathways; lay out the crystal grid; set the four corners; position poles for structure support in both the labyrinth and the after-care area; cement pathways, structural supports, center platform, and other permanent features; install tunnel skeleton. Saturday night, we will be conducting a New Moon ritual on the labyrinth site, after dark, but before dinner.

There will be opportunity for people to come out after this weekend to weave materials through the tunnel skeleton to create walls and ceilings, as well as work on soundscape components.

February 5-7: Tentative second build weekend